There is no single sequence that is right for every project. Flooring may be installed before or after cabinets depending on the flooring system, manufacturer requirements, finished floor height, appliance clearances, project schedule, and the way the work is coordinated. Floating floors, for example, generally need room to move and are often installed after the cabinets so the floor can expand and contract freely — always according to the flooring manufacturer instructions.

Both sequences work when planned. Problems come from deciding late, after cabinet heights, appliance openings and toe kicks have already been set.

Flooring first: when it makes sense

  • One level plane to set and shim cabinets on
  • Appliance openings measured against the finished floor height
  • Finished floor height can be accounted for directly when planning appliance openings.
  • Fewer transition and threshold details around cabinet runs

The trade-off is protection. The finished floor is exposed to cabinet delivery, installation and every trade that follows, so it needs proper covering.

Cabinets first: when it makes sense

  • Floating floors, which need room to move and should not be pinned under cabinets
  • Projects where the flooring product will not arrive in time
  • Situations where the flooring budget is deliberately kept separate and later
  • Replacing flooring only, with existing cabinetry staying in place

When cabinets go first, the finished floor height must still be known in advance. Cabinets are set with that thickness accounted for, so appliance openings and toe kicks stay correct.

By flooring type

Flooring typeCommon sequenceNotes
TileProject dependent / often before cabinetsMortar bed and level surface are easier without cabinets in the way
Nail-down hardwoodProject dependent / often before cabinetsContinuous subfloor fastening; refinish before cabinets go in
Glue-down engineered woodProject dependentBonded to substrate, so cabinets can sit on it where the manufacturer allows
Floating engineered or laminateGenerally after cabinetsNeeds to move; should not be trapped under cabinet bases where the manufacturer prohibits it. Manufacturer instructions take priority.
Click luxury vinyl plankGenerally after cabinetsFloating system, same movement concern; manufacturer installation instructions control
Glue-down luxury vinylProject dependentFollow the flooring manufacturer instructions and project specifications
Polished concreteProject dependent / often before cabinetsGrinding and sealing is far easier in an empty room

General guidance only. The flooring manufacturer instructions always take priority, and they typically govern the warranty.

Base cabinets meeting a finished floor with a clean toe kick line
Where cabinet and floor meet is decided long before installation day.

How the decision affects later repairs

If flooring runs beneath the cabinets, a future flooring replacement may require the flooring to be carefully cut at the cabinet footprint or may involve additional work depending on the flooring system and project conditions. If the cabinets go first, the floor can often be replaced around them, which can be simpler. This matters most in rentals and homes where flooring will likely change before the cabinetry does.

Practical rules to follow

  1. Coordinate the flooring and cabinet sequence early in the project, including the finished floor height, flooring system, appliance clearances, manufacturer requirements, and project scheduling.
  2. Read and follow the flooring manufacturer instructions.
  3. Give the installer the exact finished floor height in either case.
  4. Protect finished flooring properly if it goes in first.
  5. Verify appliance openings against the finished floor, not the subfloor.
  6. Plan toe kick, transitions and thresholds as part of the same decision.

As the installer, INSET BUILD works with either sequence. Cabinets are installed based on the agreed project conditions and scope rather than one universal rule. What matters is that the finished floor height is confirmed early so the cabinets, appliances and trim all line up when the room is finished.

Common questions

Does flooring go under the dishwasher?
It depends on the project. Flooring may or may not continue under appliances depending on the flooring system, appliance openings, and how the work is coordinated. When cabinets go first, the appliance opening should be set with the finished floor thickness accounted for.
Can floating floors go under cabinets?
Floating flooring generally needs room for movement and should be installed according to the flooring manufacturer instructions. Permanent cabinetry should not restrict a floating floor where the manufacturer prohibits it.
Will flooring first raise my counter height?
It raises the whole assembly by the floor thickness, which is normal and planned for. Problems only occur when the floor thickness was not known when the cabinets were set.
What if flooring is delayed?
Cabinets can be installed first as long as the exact finished floor height is confirmed, so toe kicks and appliance openings remain correct.